relative density crusher dust test procedure
Fill the mould with the oven dried soil sample till 1 / 2 or 2 / 3 of the collar is filled. Place the mould on the vibrating deck and fixit with nuts and bolts. Then place the surcharge weight on it. The vibrator isallowed to run for 8 minutes.
[email protected]